Help center
Open dashboard

Tips for Faster Feedback Loops with Atarim

Six ways to shorten the gap between “here’s the work” and “that’s approved”.

Atarim team Updated 7 Oct 2026 · 5 min read
Tips, Tricks, and Best Practices
A feedback thread resolved in a single pass in Atarim
Before you start

Relevant for

  • Project Managers, Design Leads and Team Members.

Required knowledge

  • Familiarity with task management, visual collaboration and integrations in Atarim.

Tools & resources needed

  • An Atarim account with collaboration features, and optionally the Chrome extension.

A slow feedback loop is rarely one big delay — it’s several small round trips. Clarifying what a comment meant, finding which page it was about, waiting for someone to notice it. Each of these removes one.

The goal is one round, not three.

1. Comment Directly on the Work

Feedback attached to the element it concerns removes the round trip of asking which part was meant.

Instructions:

  1. Open a page or design in visual collaboration.
  2. Switch to Comment mode.
  3. Select the element that needs attention and leave your feedback.
  4. Assign the resulting task to whoever will act on it.
Annotate screenshot window with a rectangle, an arrow and a text note drawn on the page
Annotating the screenshot
Comment mode has to be on
In Browse mode, selecting the page navigates rather than leaving feedback. It’s the most common reason a new reviewer thinks the tool isn’t working. Explore The Annotation Tools

2. Review with AI Before the Client Sees It

The fastest feedback round is the one that doesn’t happen. Running an AI review first catches the issues a client would otherwise spend a round reporting. A review works down the page one screen-height section at a time, and each section uses 10 credits. With Index switched on, it adds one more 10-credit pass.

SpecialistCatches
PixelVisual and design problems.
NaviUX and accessibility issues.
IndexSEO and performance.
LexiCopy that needs strengthening.
GlitchFunctional bugs.
ClaroClarity, and a strategic overview of the page.
Run a review before every client handover and mark the findings as internal tasks
The client sees a cleaner page, your team fixes the obvious things privately, and the round they do give you is about the work rather than typos. Discover How To Run An AI-Powered Page Review

3. Organise with Folders and Filters

  1. Group related projects into folders for easier navigation.
  2. Filter tasks by priority, status or tag to focus on what matters.
Set priority on tasks rather than creating tags like “High Priority”
Priority is a built-in field with four values, and using both means filtering two ways for the same thing. Explore Using Tags Effectively

4. Set Project Stages for Accountability

Stages give the client somewhere to look instead of asking you where things stand.

Instructions:

  1. On the Projects screen, open the project’s ⋮ menu and select Set Project Stages.
  2. Under Create a new Milestone, enter a Milestone Title for each stage your work actually runs through.
  3. Set a Due Date, then select Create.
  4. Share the stages with clients so progress is visible.
  5. When a stage is finished, select the clock icon beside it (Mark milestone as complete).

Project stages are a paid feature, and Team Members don’t see Set Project Stages by default.

Milestones dialog with a milestone title, a due date picker and Create
Establishing project stages
Milestones dialog for a project with two active stages and the Mark milestone as complete icon
Setting up a milestone
Stages email the people on the project
Creating or completing a stage emails everyone assigned to the project, and Atarim emails them again as a stage’s due date approaches and after it passes. A client reviewing through a share link without an account is not emailed, so tell them directly. Explore Project Stages

5. Get Notifications Right

Notifications only speed things up if they reach the person who has to act, so everyone needs their own set.

Instructions:

  1. Open Settings → Notifications under the Communication group.
  2. Switch on the events you want to hear about.
  3. Ask team members to review their own preferences too.
Workspace notification settings
Workspace notification settings
Individual email preferences
Individual email preferences
Note
Notifications are batched rather than instant — they go out once a project has had 15 minutes with no new activity, so a burst of comments arrives as one email rather than fifteen. That’s deliberate, and it’s why a notification doesn’t appear the second a client comments.
Preferences are per person
Someone missing updates is usually their own settings rather than a workspace problem. That’s also the first thing to check when a task sits unnoticed. Explore Email Notifications

6. Connect the Tools Your Team Lives In

A task nobody sees is a task nobody does, so push them into the tools your team already has open.

Instructions:

  1. Go to Settings → Connected Apps → Integrations.
  2. Connect Slack, Jira, Asana or whichever tools apply.
  3. Test that tasks and updates sync as expected.
A third-party app being connected
Connect Your Favorite App
Note
Native integrations such as Slack, Jira and Asana are a paid feature. In workflows, actions that push a task to a tool such as Jira or ClickUp only appear once that integration is connected and switched on. See All Integrations

FAQs

Can clients see internal tasks?

No. Internal tasks are visible to your team only, and they don’t send notification email.

Are team members notified immediately when feedback arrives?

No. Notifications go out once a project has had 15 minutes with no new activity, so a burst of comments arrives as one notification rather than many.

How do I keep feedback organised across projects?

Use workspaces, folders and boards so each project stays separate and prioritised.

What’s the fastest way to cut a review round?

Run an AI review before handover. Fixing the obvious issues privately means the client’s round is about the work itself.

Do reviewers need the Chrome extension?

No. It’s for your team, particularly on staging sites and pages behind a login.

Why didn’t a stage change notify the client?

A client who has an Atarim account and is on the project is emailed like anyone else assigned to it — creating or completing a stage sends an email, and so do the due-date reminders. A client reviewing through a share link without an account is not emailed at all, so tell them directly.

Common issues

  • A reviewer says clicking does nothing — Comment mode isn’t on.
  • Notifications feel delayed — expected. They’re sent once a project has been quiet for 15 minutes.
  • One person isn’t getting updates — preferences are per person. Check their own settings.
  • Feedback keeps needing clarification — run an AI review before handover so the obvious issues are already fixed.
  • Clients keep asking for status — share project stages, and tell them when one changes.
  • An integration isn’t in the workflow list — connect it and switch it on in Settings first.

Conclusion

Faster loops come from removing round trips: comment on the element rather than describing it, fix the obvious things before handover, and make sure the right people actually hear about what’s waiting on them.

The highest-leverage habit is running an AI review before the client sees the work. A round you never have to run is faster than any round you run well. Discover Reducing Feedback Cycles With Visual Collaboration

Tips & best practices

  • Onboard new reviewers properly — start with Comment mode.
  • Run an AI review before every client handover.
  • Use tags for what priority and status can’t express.
  • Watch boards for tasks that have stopped moving.
  • Enable only the notifications people will act on.
  • Keep internal discussion in internal tasks.

Related articles